Budget Hearing Meeting – Capital Fund, October 7, 2026

Main Subject

The primary focus of the October 7, 2026 Capital Fund budget hearing was Fund 50 trying to stay solvent on $1,139,250 in projected revenue against about $1,239,520 in expenses before the underfunded-courthouse grant and a roughly $180,000 grader balloon payment are added, while the real cash is locked in airport runway lights, landfill equipment, Road and Bridge leases, and a $300,000 courthouse roof piece that still needs an engineer.

Summary

This was the Capital Fund budget hearing on October 7, 2026. Finance director Vernon Roth walked Fund 50 with commissioners and staff. No roll-call votes. No public comment. This is the capital fund. It is not the general fund and it is not the $400,000 operating shortfall. There are two money piles. The first is Fund 50 itself. Working 2027 revenue is $1,139,250. Working expenses before the extra pieces are about $1,239,520. That is already a gap. The second pile is what gets added on top: a $300,000 underfunded-courthouse grant that is not yet in the revenue column, and a roughly $180,000 balloon payment on the Road and Bridge graders. After those, expenses run further ahead of revenue. A $300,000 transfer from the general fund (or from fund balance) is in the sheet and may be swapped later. Revenue lines are ordinary capital sources. The 0.5% sales-tax share (the other 1.5% stays in the general fund) is budgeted at $350,000, down from $375,000 in 2026 and $429,000 in 2025. Grant revenue is $254,000, mostly airport reimbursement. Sale of assets is a $100,000 placeholder. Building and zoning fees are $35,000. Sales and use tax is $100,000. Interest was discussed as a possible offset; past interest has been used for other funds, and the room noted Weld County’s much larger reserve earnings as a contrast, not as a Custer number. Expense lines are mostly leases and projects, not new debt. Counties cannot bond in the ordinary sense; these are capital leases. County Commissioners capital improvement is $20,000 for Thin Air Communications work on radio towers. Assessor is $4,000 for a plotter lease. Buildings and Grounds is $52,640 for the land payment next door and roof work. Landfill is $210,000 for compactor and scraper payments; the scraper was justified because rental had run about $70,000 for two months. Airport is $282,500 for the runway-light project, first year of a 90/10 split (county 90%). Sheriff is $84,000 for financed vehicle payments; no new vehicles. Wetmore Community Center is $28,000 for a conventional split-unit air conditioner. Road and Bridge is $263,452 for three grader payments, a tractor, and a tank trailer, and that line is where the balloon sits. The courthouse roof piece is the same $300,000 Underfunded Courts path heard on September 30. It is a 5% upcharge structure that nets about $285,000 after the county’s share. It covers the court portion, not the whole building. Broadband gear on the roof has to move. An engineer of record is still required. The balloon on the graders is about $180,000 and may hit in March or September. Using interest or refinancing was discussed and not decided. Asset sales were named. A small grader Scotty does not want is headed to auction. A Dodge diesel bought with ARPA for public health cannot be sold yet. Auctioneer contracts (one cited at 30%) need a workshop; a minimum-bid process was preferred so residents can buy. No motion closed the $1,139,250 revenue, the $1,239,520 expense, the $300,000 transfer, the courthouse grant, or the balloon. Next steps named were the auction workshop, the engineer for the roof, and a later decision on whether the $300,000 comes from the general fund or from fund balance.

Key Points

Meeting

  • Capital Fund budget hearing, October 7, 2026.
  • Finance: Vernon Roth on Fund 50.
  • No roll-call votes. No public comment.
  • This is capital. It is not the general fund and not the $400,000 operating shortfall.

Two piles — do not mash them

  • Fund 50 working revenue: $1,139,250.
  • Fund 50 working expenses before extras: about $1,239,520.
  • Still to be added: $300,000 underfunded-courthouse grant (not yet in the revenue column) and a roughly $180,000 grader balloon.
  • A $300,000 transfer from the general fund or from fund balance is in the sheet and may be swapped.
  • After the extras, expenses run further ahead of revenue.

Revenue

  • 0.5% sales-tax share: $350,000 (down from $375,000 in 2026 and $429,000 in 2025). The other 1.5% stays in the general fund.
  • Grant revenue: $254,000, mostly airport reimbursement.
  • Sale of assets: $100,000 placeholder.
  • Building and zoning fees: $35,000.
  • Sales and use tax: $100,000.
  • Interest discussed as a possible offset. Not locked as a 2027 number.

Expense lines — leases and projects

  • Commissioners capital improvement: $20,000 for Thin Air Communications radio-tower work.
  • Assessor: $4,000 plotter lease.
  • Buildings and Grounds: $52,640 for the land payment next door and roof work.
  • Landfill: $210,000 for compactor and scraper payments. Scraper was justified because rental had run about $70,000 for two months.
  • Airport: $282,500 for the runway-light project. First year of a 90/10 split (county 90%).
  • Sheriff: $84,000 for financed vehicle payments. No new vehicles.
  • Wetmore Community Center: $28,000 for a conventional split-unit air conditioner. Fiber to the building was called over $50,000; VoIP is the cheaper path.
  • Road and Bridge: $263,452 for three grader payments, a tractor, and a tank trailer. Balloon of about $180,000 sits on this line.

Courthouse and the balloon

  • Underfunded Courts path: $300,000 grant, 5% county upcharge, nets about $285,000. Court portion only.
  • Broadband gear on the roof has to be relocated.
  • Engineer of record still required. Full roof cost may exceed the grant.
  • Grader balloon: about $180,000, possible March or September. Refinancing versus payoff was discussed and not decided.
  • 2026 capital-lease payments were about $367,000. 2027 due is about $442,000. Total lease liability cited around $1.9 million, with some assets (compactor) paid off by 2030.

Asset sales

  • Small grader Scotty does not want: headed to auction.
  • Dodge diesel bought with ARPA for public health: cannot be sold yet.
  • Auctioneer contracts (one cited at 30%) need a workshop. Minimum-bid process preferred so residents can buy.

What was not decided

  • No motion on the $1,139,250 revenue or the $1,239,520 expense.
  • No motion on whether the $300,000 comes from the general fund or from fund balance.
  • No motion on the courthouse grant scope or the engineer.
  • No motion on refinancing versus paying the $180,000 balloon.
  • No auctioneer selected.
  • Next steps named: auction workshop, engineer for the roof, and a later call on the $300,000 source.

Summarized Transcription

Vernon put Fund 50 on the table. Revenue is $1,139,250. Expenses before the extras are about $1,239,520. That is already a gap. A $300,000 underfunded-courthouse grant is not in the revenue column yet. A $180,000 balloon on the graders is not fully in the expense column yet. After those, the fund runs further behind.

The 0.5% sales-tax share is $350,000. Grants are $254,000, mostly airport. Asset sales are a $100,000 placeholder. Fees are $35,000. The big expense lines are the airport at $282,500, Road and Bridge at $263,452, the landfill at $210,000, the sheriff at $84,000, and Buildings and Grounds at $52,640. Wetmore gets $28,000 for a split-unit air conditioner. No new sheriff vehicles.

The courthouse piece is the same $300,000 path from September 30. It covers the court portion. An engineer is still required. The balloon may hit in March or September. A small grader goes to auction. A 30% auctioneer fee was called too high. No vote on any of it.

This is capital. It is not the general-fund hole.

Leave a Reply

Your email address will not be published. Required fields are marked *

Associated Polls

Fund 50 already short before the extras: Revenue $1,139,250. Expenses about $1,239,520 before the courthouse grant and the balloon. How should the gap be closed?
$180,000 grader balloon: Sits on the Road and Bridge line. Possible March or September. Refinance or pay it?
Airport $282,500, county 90%: First year of the runway-light project. County pays 90%. Support it?
Courthouse $300,000 grant, engineer still required: Same path as September 30. Court portion only. Full roof may cost more. Proceed?
Keep capital off the operating budget: Fund 50 is leases and projects. The $400,000 operating shortfall is a different pile. How should residents see them?